
The crew has been roughing in the walls, electrical, whatever can be done on the existing second floor.

Don't forget that the back wall (on the left) will be torn down and rebuilt 2 feet beyond where it is now, giving us more space. There is an existing bump out now, the difference is that all of the wall will be this far out.

The new section got it's windows today on the second floor.