Saturday, March 14, 2009

Existing second floor build Thursday March 12


Thursday night I walked up to the second floor and walked through the newly constructed walls that form the master bathroom. After the hours and hours that Diane put into figuring out this layout, it seemed claustrophobic in reality. The constraints Diane had were to make the shower room, the bath tub room as small as possible to keep them warm. Her layout accomplished this but it was a series of hallways. Neither one of us having no experience in this sort of design, it was hard to see this from the layout.






I went back up stairs and figured out a way that would allow all of the ordered fixtures and tubs in a design that was still warm with small rooms but eliminated the hallways and made it seem more open. It worked out nicely, and we were able eliminate the section that was protruding into the master bedroom, giving us more room.