This is a shot of inside of the new masterbath, from the corner where the tub sits. The two door ways at the end are the closet on the left (the shower stall is sitting in there now (it's red)) and on the right is the doorway for the shower and to the toilet.
This is a picture taken from the master bedroom room walking into the bathroom , there is so much more room. Again this layout eliminated the hallways between the shower room, walk in closet, the water closet (toilet) and the bath tube room.
As you can see, they have spayed a two part urathane expanding foam to "seal" the outer walls. From there, insulation will be applied. These walls are 6 inches thick per code, and should provide much better insulation.
Jim's framer, Gino built these platforms for the fron load washer and dryer. Instead of buying the expensive 12 in platforms, we built 24" platoforms so that the dryers are at working height. There is also plenty of storage slace underneath.