Saturday, April 11, 2009

Boucany progress Saturday April 11, 2009


This is now the "new" entrance for the renovations. Note the missing railing: All of the vanities, carpet and tile will come through here at the back of the house.


The decking used is a plastic composite. The railings are alluminum, and the post are extruded composite covers over the 4X4 pressure treated posts.


The vertical post will be removed, and the main supports will be the angled 2X6s. We wanted to cantilever it but we were already cantilevering the second floor out two feet. The boucany is about 4 ft and this would have been beyond an acceptable distance.