Thursday, February 26, 2009

Second floor build Thursday Febuary 26th, 2009


Pulling up to the house you can already see the size is completely different.



If you flip down a previous day this week you can see the big change to this corner.



From this angle I am standing at the corner of the rear of the house. You can see the opening for the second floor laundry room that will have a window facing out over the drive way. The blue tarp on the right covers the only exposed room at this point: the first floor office. Mike (Jim's framer/lead guy for the build up) carefully had the tarp placed so that in the case of the expected rain this week, the water would shed nicely and keep the drywall in the office dry.


You can appreciate the bump out taken from the same spot as the above photo. The decking is dead on with the existing flooring that is exposed in the silhouette of the now bare gable. The rear windows of the bedrooms (shown on the right) look out onto our two acre property.